Skip to content

SLDPW

Solid Power, Inc.

NASDAQ · Industrials · Electrical Equipment & Parts · US

$0.03
+0.40%
Ask drillr

Next report

Analyst consensus

Next report date
Nov 10, 2026
EPS estimate
-$0.12
Revenue estimate
$1.4M

Latest reported

Last report date
Aug 4, 2026
EPS actual
-$0.11
EPS estimate
-$0.12
Revenue actual
-$1.0M
Revenue estimate
$1.6M

Track record

Trailing twelve quarters

EPS beats (12Q)
4
EPS misses (12Q)
0
EPS in line (12Q)
1
Avg surprise (4Q)
+21.2%
Revenue beats (12Q)
2
Earnings call summaryRead the full call →

Q2 FY2025 · Aug 6, 2025

AI summary of management’s prepared remarks and analyst Q&A · For informational purposes only, not investment advice

Management highlights

  • Partnership with BMW: Reached a significant achievement with BMW introducing an i7 test vehicle powered by their cells and solid-state battery technology, highlighting potential of electrolyte and cell technologies.
  • SK On pilot line: Completed factory acceptance testing of the SK On pilot line, a key milestone under the line installation agreement, with work towards site acceptance testing later this year.
  • Electrolyte development: Finished ordering long lead equipment and began detailed design for a continuous manufacturing pilot line for sulfide electrolyte production at SP2, on track for commissioning in 2026; received $3.3 million in reimbursements under DOE agreement.
  • Shareholder value: Repurchased 3.3 million shares in Q2 at an average price of $1.05, totaling ~$3.6 million under stock repurchase program.

Segment performance

In the second quarter of 2025, Solid Power generated revenue of $7.5 million, up from $6 million in Q1 2025. Year-to-date revenue stands at $13.5 million. There are no distinct product segments detailed in the transcript, so performance is presented at the overall company level.

Analyst Q&A

Q: [Operator instructions to start Q&A, but no specific questions asked] A: [Operator indicates question-and-answer session concluded with no specific exchanges]

Reported results against consensus at the time of each report · Surprise is computed from the estimate on record · Data as of Nov 10, 2026